Section A1.2 of the Ammonia Code of Practice indicates that all operations less than 500 metres from population concentrations or less than 100 meters from any occupancy are required to have installed pull away protection on BOTH liquid and vapour hose connections (both in load and out load). This requirement becomes mandatory on January 1, 2017. This protocol is intended to minimize the risk to people from an accidental release of anhydrous ammonia. Please refer the Section A1.2 of the Implementation Guide for compliance information
Connect
We are a positive impact
Join the conversation through our social media channels, get the latest news from our newsletter or become a member of Fertilizer Canada!
Follow
Stay in the know about the fertilizer industry by following our social media channels.
Join
Benefit from a wide range of services provided by a team of respected industry professionals.